Planned properly.
Delivered as one programme.
ADV Construction Group carries out specialist sheet-pile installation up to 18 metres for retaining structures, excavation support and demanding groundworks.
The installation method is never selected on pile length alone. We first review the engineer’s design, pile section, ground information, access, lifting requirements, neighbouring structures and any vibration or noise constraints. From there we establish a safe installation sequence and coordinate plant, temporary works and excavation with the wider project.
The right sequence is part
of the workmanship.
Engineering review
Pile design, ground conditions, retained height, adjacent structures and installation tolerances are reviewed before plant is selected.
Method & logistics
Access, lifting, delivery, working platform, installation sequence and vibration considerations are planned around the site.
Installation
Qualified operatives install the piles in the agreed sequence with plant movements and exclusion zones controlled.
Excavation interface
Bracing, excavation and adjoining structural works are coordinated so the retaining system performs as intended.
Let’s review the project
before you commit.
Send us the drawings or tell us what you are planning. We can arrange a site review and discuss the practical route forward.